Subscribe via RSS

Archives by Date
September 2008
August 2008
July 2008

See all Archives
Archives by Category
'Canes
Afghan Update
Ammo and Munitions
Armor
Around the Globe
Av Week Extra
Axe in Iraq (and Elsewhere)
Bizarro
Blimps
Blog Bidness
Body Armor Blues
Bomb Squad
Brownshoes in Action
Bubbleheads, etc.
Cammo Green
Catch the "Buzz"
Chem-Bio
Civilian Apps
Cloak and Dagger
Commandos
Comms
Contingency Ops
Cops and Robbers
Cyber-warfare
Data Diving
Defense Tech Poll
Dissent Tech
Door Kickers
Drones
DT Administrivia
Eat DT's Dust
Extra! Extra!
Eye on China
Fast Movers
FCS Watch
Fire for Effect
FOS Files
Friday Funnies
Gadgets and Gear
Going Green
Grand Ole Osprey
Ground Vehicles
Guns
Homeland Security
In the Weeds with Eric
Info War
Iraq Diary
Jarhead Jazz
JSF Watch
Just War Theories
Lasers and Ray Guns
Less-lethal
Logistics
Los Alamos and Labs
M4 Monopoly
Medic!
Mercs
Missiles
Money Money Money
Most Wanted
MRAP Edge
Net-Centric
Nukes
Old Skool
Our Shrinking Planet
Planes, Copters, Blimps
Politricks
Polmar's Perspective
Popular Mechanics
Rapid Fire
Raptor Watch
Red Team
Retro-Futuro
Robots
Roll Your Own
Sabra Tech
Ships and Subs
Snipertech
Space
Special Ops
Star Wars
Strategery
Stray Trons
Tactical Development
Terror Tech
The Deadlies
The Defense Biz
The Peoples' Site
The Sunday Paper
The Tanker Tango
The View from Av Week
Those Nutty Norks
Training and Sims
Trimble on the Case
Video Lounge
War Update
Ward'z Wonderz
You can run...

See all Archives
Newsletters

Edited by Christian Lowe | Contact

Freedom Class Ships Liberated

The Navy announced yesterday it would lift a month-long stop-work order on the service’s troubled Littoral Combat Ship program. DoD release follows…

March 15, 2007 -- Secretary of the Navy Recommends Way Ahead for Littoral Combat Ship Program

Based on a comprehensive review of the Littoral Combat Ship (LCS) acquisition program, Secretary of the Navy Donald C. Winter announced today that he is prepared to lift a previously issued stop work order for construction of LCS 3.The ship is currently under contract to Lockheed Martin Corp. Maritime Systems & Sensors unit, Moorestown, N.J. Lifting the stop work order is contingent upon the Navy and Lockheed Martin reaching agreement on a renegotiated contract.

LCS-1-web.jpg

As a result of a nearly two-month assessment, the Navy has revalidated the warfighting requirement and developed a restructured program plan for the LCS that will improve management oversight, implement more strict cost control, incorporate selective contract restructuring and ensure that an important warfighting capability is provided to the fleet consistent with a realistic schedule.

This plan will ensure best value to the Navy for the completion of LCS ships 1-4, procurement of existing designs in fiscal 2008 and 2009 to fill the critical warfighting gap and establish a sound framework for transition to a single selected design in fiscal 2010.The Navy will work closely with Congress on reprogramming actions necessary to bring this program forward.

"It is vital that the Navy continue through first of class construction challenges to complete LCS 1 and LCS 2.When these ships are delivered, we will be able to fully evaluate their costs and capabilities," said Winter. "LCS 3 construction may be resumed under revised contract terms that rebalance the risk of cost growth between the government and industry. LCS 4 construction will continue as long as its costs remain defined and manageable."

Under the restructured program plan, the Navy will recommend deferral of procurement of LCS in fiscal 2007 and use those funds to complete the construction of LCS 1-4.The Navy intends to continue with a plan to procure a reduced number of ships in fiscal 2008 and 2009 within existing budget resources and with the approval of Congress because of the compelling need to address critical warfighting gaps in the littorals and strategic choke points.

The Navy will transition to a single seaframe configuration, incorporating a Navy-specified open architecture combat system, in fiscal 2010 after an operational assessment of all critical factors between LCS 1 and LCS 2.The Navy will hold a full and open competition of the selected design (flight 1) for the fiscal 2010 seaframe procurement to reduce life cycle costs of the program.

"LCS is needed now to fill critical, urgent warfighting requirements gaps that exist today. It is imperative that the Navy deliver this warship class and its important capabilities to the fleet as soon as possible," said Chief of Naval Operations Adm. Mike Mullen. "It is just as imperative that we do so in the most cost effective manner possible."

The LCS is an entirely new type of U.S. Navy warship. A fast, agile, and networked surface combatant, LCS's modular, focused-mission design will provide combatant commanders the required warfighting capabilities and operational flexibility to ensure maritime dominance and access for the joint force. LCS will operate with focused-mission packages that deploy manned and unmanned vehicles to execute missions as assigned by combatant commanders.

Operational experience and analyses indicate that potential adversaries will employ asymmetric capabilities to deny U.S. and allied forces access in critical coastal regions to include strategic choke points and vital economic sea lanes. Asymmetric threats will include small, fast surface craft, ultra-quiet diesel submarines and various types of mines.

LCS will also perform special operations forces support; high-speed transit; maritime interdiction operations; intelligence, surveillance and reconnaissance; and anti-terrorism/force protection. While complementing capabilities of the Navy's larger multi-mission surface combatants, LCS will also be networked to share tactical information with other Navy aircraft, ships, submarines and joint units.

Resources:

GAO: Plans Need to Allow Enough Time to Demonstrate Capability of First Littoral Combat Ships
Lexington Institute: Modularity, the Littoral Combat Ship and the Future of the Navy
Congressional Research Service: Littoral Combat Ship: Oversight Issues and Options for Congress
Official LCS Website

-- Christian

Comments

It may be good but it also looks like a cruise ship. Mabye its good Camo but still it dont look like a warship but i hope its got the firepower to back it up.

Posted by: Walter Schwall IV at January 9, 2008 09:16 AM


A point of terminology. Deepwater/ICGS is the overall Program, the FRC is only one of many Projects within it.

There were critics of Deepwater before 9/11 especialy congressional types who as always wanted to steer ship builidng to their backyard shipyards.

Yes the USCG was over-streched in its ability to manage such a huge acquistion. NO the USCG was not in new territory when it comes to buildig ships, they have been doing that for hundreds of years!

Also there are several success stories in the aviation and communications parts of ICGS. The Program is not merely to revamp the USCG inventory but to develop a system of systems approach - a lofty goal of which I hope the USCG can attain. It is in the country's best interest after all.

I agree that USCG has been over-reaching, but ICGS is not a catastrophe as yet. Nothing like the USN's DDX and LCS fiascos! I like Adm Allen's proactive response to all the service's problems! I am not optimistic the Navy will get its act together. SECNAV came from a big conglomerate so decisions are suspect. His announcement today about LCS was a safe decision and a hard course change for the LCS program. Multi-billion dollar ships and 1000 ship navy don't belong in the same sentence!

Posted by: Lee Wahle at March 16, 2007 09:04 PM


Post a comment




Remember Me?


Please enter the code as seen in the image below to post your comment.